For teams whose first AI pilot has to land

AI pilot design consultant for teams that want production, not a POC

Pilot shortlisting, evaluation harness design, governance charter, and a 90-day execution plan, by one named advisor who has closed the pilot-to-production gap at UBS and JPMAM.

The case for an AI pilot design consultant

Between 30 and 50 per cent of generative AI pilots are abandoned after proof of concept (Gartner, 2024 and 2025). An S&P Global 2025 survey of more than a thousand enterprises found forty-two per cent of companies abandoned most of their AI initiatives in 2025, up from seventeen per cent in 2024. The average organisation scrapped forty-six per cent of its proof-of-concepts before they reached production. The problem is rarely the model; it is the shape of the pilot.

A well-designed AI pilot closes the production gap at design time, not after the budget has been spent. Data posture, evaluation harness, cost envelope, governance charter, and the 90-day execution plan all matter more than the choice of model. A pilot-design consultant writes those decisions down before the team touches the engineering.

AI pilot failure, by the numbers

Six data points drawn from Gartner, McKinsey, S&P Global, and the Bank of England and FCA. These are the numbers a CTO or Head of AI wants cited back in a pilot business case.

30–50%
of generative AI projects abandoned after proof of concept, per Gartner’s 2024–2025 updates
85%
of AI projects fail due to poor data quality, per Gartner; a design-time problem, not an execution one
Source: Gartner
42%
of companies abandoned most AI initiatives in 2025, up from 17% in 2024; average org scrapped 46% of POCs
<10%
of vertical AI use cases reach production; 88% enterprise adoption vs 7% fully scaled
45%
of high-AI-maturity organisations keep AI projects operational for 3+ years; most do not
1/3
of UK financial services AI use cases are now third-party, up from 17% in 2022; vendor risk rises steeply in any pilot

Three points land together. The probability that any given pilot reaches production is low, but the cause is almost always a design-time decision (data, scope, evaluation, or governance). The best-in-class projects that do survive past three years do so because they were scoped properly at the start. And in UK regulated sectors, third-party vendor exposure has doubled in two years, which is now a first-order design consideration, not a late-stage one.

Engagement patterns for ai pilot design consultant work

Four shapes of work teams most often ask a senior named pilot design advisor to take on.

Pilot shortlisting workshop

A 2-3 week engagement for a team with a green-light AI budget and no shortlist yet. Deliverable: a prioritised shortlist of three to five pilots, each scored on business impact, data readiness, regulatory surface, cost envelope, and probability of reaching production by month 12.

Full pilot design and 90-day plan

A 4-6 week engagement covering evaluation harness, governance charter, vendor and architecture shortlist, data-posture checklist, and a 90-day execution plan with named owners and a monthly review cadence.

Pilot-rescue diagnostic

A 2-4 week diagnostic for a team whose pilot is drifting and whose budget is being questioned. Deliverable: a written diagnosis covering data quality, evaluation harness, scope creep, stakeholder misalignment, and vendor lock-in, plus a revised 90-day plan.

AI adoption roadmap

A 6-10 week engagement for a mid-market executive team or board. Deliverable: a 12-24 month sequenced roadmap with per-pilot business case, governance structure, and a vendor-mix recommendation grounded in Menlo Ventures market-share data.

The engagement process

Engagements start with a 30-minute intro call with the CTO, Head of AI, Head of Data, or board sponsor. If the shape of work is clear we send a scoped proposal within 48 hours. If it is not, we run a short paid scoping exercise before committing to a number. Teams that do not yet have a shortlist to design against usually start with AI adoption consulting instead, which produces the prioritised list this engagement then designs from.

  1. Scope. 30-minute intro plus a written brief covering the current shortlist, budget, and regulatory context.
  2. Discovery. Structured review of the data posture, current stack, and stakeholder map.
  3. Design. Evaluation harness, governance charter, architecture and vendor shortlist, and the 90-day execution plan.
  4. Read-out. Live read-out with the executive sponsor plus a written board or audit-committee briefing.
  5. Continuity (optional). A time-boxed design engagement can roll into a monthly advisory retainer covering architecture reviews and pre-release sanity-checks.

Boutique vs Big-4

A Big-4 pilot-design engagement lands a generalist partner at kick-off then outsources the data posture and evaluation harness to associates who have rarely shipped a production AI system. A boutique engagement puts one named principal, who has closed the pilot-to-production gap at UBS and JPMAM, in the architecture review, the evaluation-harness design, and the 90-day plan. With thirty to fifty per cent of generative AI pilots abandoned after proof of concept, and only forty-five per cent of even mature teams keeping AI projects alive past thirty-six months, the design of the pilot is the single highest-leverage decision.

The boutique model inverts the incentives. One named principal whose credentials carry the work. Pilot plans written by the person who will defend them at the review committee, not by an associate who has never reviewed an evaluation harness against production data.

The principal advisor

Berkan Sesen was Head of Algorithmic Execution and AI at UBS and Senior Quantitative Portfolio Manager at JP Morgan Asset Management, running ML-powered thematic funds at $2B+ AUM. Two US patent filings on thematic investing and content filtering. Oxford DPhil in AI and Medical Informatics (Clarendon Scholar). Currently co-founder across three AI companies (sesen.ai, Recallify, ReviewSense AI) and a Techstars / AI Forge startup mentor since 2019, so first-pilot decisions are a daily occupation. Read the full background at /about/founder. For hands-on implementation after the pilot is designed, see the LLM implementation consulting practice. For CTO-level readiness work across a portfolio of pilots, see the AI readiness assessment for CTOs practice.

Interactive tools

Free tools built to solve concrete questions that come up during an AI pilot design engagement:

  • LLM cost calculator. For sizing pilot inference spend across providers before committing to an architecture.
  • Full tools catalogue. Calculators and visualisers for statistics, information theory, and Bayesian inference, useful in evaluation-harness design.

Related reading

Next step

30-minute intro call with the CTO, Head of AI, Head of Data, or board sponsor. A scoped proposal within 48 hours if the shape of work is clear, or a short paid scoping exercise if it is not.

Book an intro call

Stay in the loop

Get notified when new tutorials and deep-dives are published. No spam, unsubscribe anytime.

Frequently Asked Questions